Tring Park School

Hertfordshire

Providing new boarding facilities for 70 students at this Performing Arts School in Tring where academic performance also shines

Stepnell were awarded the project following competitive tender, where we made a positive input into reducing the scope and specification of the scheme to meet the client’s budgetary requirements.

The new building now provides boarding facilities for 70 students on the ground, first and second floors, with teaching spaces at lower ground level.

Construction methods consisted of concrete frame with ground bearing slab and sheet piled retention to 77 linear metres to the south of the site, with a steel frame for the second floor. Insulation and metal cladding with a timber ‘screen’ attached sit on the building’s timber cassette envelope.

The roof has been constructed using single ply membrane with a perimeter metal gutter.

  • Client:

    Tring Park School

  • Architect:

    Burrell Foley Fischer

  • Programme:

    66 weeks