STEPNELL Building and Civil Engineering

01788 574 511
info@stepnell.co.uk

Construction Lean Improvement Programme

CLIP is a modern design and construction best practice that Stepnell has introduced on many projects. The key driver for CLIP is to minimise waste in all its forms including the physical by-product from the construction process to design and management time. The outcome is a more thoughtful design that considers the building process both in sequence and detail that is proven by Stepnell to save money at several levels.

Download the Whitecross CLIP case study