STEPNELL Building and Civil Engineering

01788 574 511
info@stepnell.co.uk

Health Case Studies

Please find below a cross-section of our experience in the Health sector:

Case Study Link - NGH Combined 100

Northampton General Hospital Combined Case Building

A four storey steel framed building, linking in to existing adjacent hospital buildings in six different locations.  Each floor housing a different medical specialty., including cardiac treatment centre, renal treatment ward, nuclear medicine department and Radiopharmacy clean room suite.

MORE»
Case Study Link - Cynthia Spencer 100

Cynthia Spencer

The reprovision of Cynthia Spencer Hospice demonstrates Stepnell’s ability to deliver complicated projects to a high quality that are constructed on occupied sites.

MORE»
Case Study Link - Malmesbury (2) 100

Malmesbury - Care Home and Day Care Centre

80 bed care home 3492m2 (GIFA) Day care centre 218m2 (GIFA) 2 storey timber frame building. Care Home - 80 ensuite bedrooms in 4 wings with separate dining rooms and services, lounges, sitting rooms and assisted bathrooms.

MORE»
Case Study Link - LINAC 100

Northampton General Hospital Accelerator Building

The first bunker was handed over 6 months before the remainder of the building, so that the specialist medical equipment could be installed, commissioned and staff trained, ready for use when the building was completed.

MORE»
Case Study Link - Malmesbury (3) 100

Malmesbury - Primary Care Centre

Primary Care Centre including 13 GP consulting rooms, 4 nurse treatment rooms, treatment suite with minor operations facility, physrotheraphy suite with consulting and treatment rooms and a gym, district and community nursing facilities, social services, audiology, reception and administration.

MORE»
Case Study Link - Kettering General 100

Primary Health Care Facility, Kettering

Primary Health Care Facility, 32 G.P. Consulting Rooms, Treatment Suite inc. Minor Operations, District & Community Nursing, Health Education, Reception and Administration.

MORE»