Dormer Place, Leamington Spa

Case Study - Dormer Place (1) 200

Client:
Stepnell Estates
Value:
JCT1998 with Contractors Design
Contract:
JCT
Duration:
67 Weeks
Category:
Industrial, Commercial & Retail

Case Study - Dormer Place (2) 200

Refurbishment of existing period building, together with substantial 2 storey modern extension on the banks of the river Leam.
Specific Elements – Late instructed internal fit out for occupants carried out within the original construction programme period. Very high quality internal finishes including bespoke architectural joinery manufactured and installed by our in house joinery department. Designed to accommodate site location within river flood plain. Rebuilding river bank wall from pontoons moored within the river.